RTEMS 4.6.1 On-Line Library
ITRON Implementation Status Rendezvous
RTEMS ITRON 3.0 API User's Guide
14.8: Rendezvous
- Implementation
- cre_por - Stub, Needs to be Fleshed Out
- del_por - Stub, Needs to be Fleshed Out
- cal_por - Stub, Needs to be Fleshed Out
- pcal_por - Stub, Needs to be Fleshed Out
- tcal_por - Stub, Needs to be Fleshed Out
- acp_por - Stub, Needs to be Fleshed Out
- pacp_por - Stub, Needs to be Fleshed Out
- tacp_por - Stub, Needs to be Fleshed Out
- fwd_por - Stub, Needs to be Fleshed Out
- rpl_rdv - Stub, Needs to be Fleshed Out
- ref_por - Stub, Needs to be Fleshed Out
- Notes:
- Hardest ITRON Manager to Implement
- Executive Modifications
- Doubtful, Probably Implement in Terms of Multiple SuperCore Objects.
- Testing
- No Tests Written
- No Timing Tests
- Documentation
- Shell, Needs to be Fleshed Out
- ITRON 3.0 API Conformance
- Level E - Extended Functionality
- Level C - CPU Dependent Functionality
- Level N - Connection Functionality
RTEMS ITRON 3.0 API User's Guide
Copyright © 1988-2004 OAR Corporation